Kansas Department Of Transportation
Home MenuStover Road Bridges over U.S. 24
Project Description
This priority bridge replacement project is in the early design phase and includes replacement of the Stover Road Bridges over U.S. 24 in north Topeka in Shawnee County. Specifically, this project is the replacement of bridge #104 (southbound) and bridge #105 (northbound), which are located 0.42 miles east of the U.S. 24 / U.S. 75 junction.
Replacement of the existing bridges is necessary due to the end of their service life. Additional benefits of the project include reducing future maintenance needs and enhancing safety and connectivity.
This project is part of the KDOT Priority Bridge Replacement Program, and it is anticipated to be under construction in the spring of 2028.
Project Location
Project Details
Project Name | Stover Road Bridges over U.S. 24 |
Project Number | KA-6480-01 |
Location | Stover Road Bridges over U.S. 24 in north Topeka in Shawnee County, and specifically, bridge #104 (southbound) and bridge #105 (northbound), which are located 0.42 miles east of the U.S. 24 / U.S. 75 junction. |
Scope | Bridges replacement project to replace two bridges along Stover Road over U.S. 24. Current Preliminary Design Phase involves roadway design, bridge design, traffic analysis, traffic modeling, a Transportation Management Plan, Maintenance of Traffic staging and phases, and community engagement. Future Construction Phase will include the removal of the two Stover Road Bridges over U.S. 24 and construction of replacement bridges. |
Approximate Length | N/A |
Project Timeline | Early Design |
Construction Cost | $4.1 Million |
Related Projects
Public Meetings
Events
-
U.S. 24 and I-70 Projects Open House
11/13/2024 5:00 PM - 7:00 PM
Project Materials
Documents
Project Contacts
Project Updates
Join the email list and receive project information updates.