Projects

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Learn about projects happening across the state, organized by district. Whether you're interested in road improvements, bridge constructions or other infrastructure developments, this page provides status information and direct links to each project. Simply select your district from the list below to explore the active projects in your area. Thank you for staying informed and supporting the growth and safety of Kansas' transportation network.

District 1 Northeast Kansas

Counties: Atchison, Brown, Doniphan, Douglas, Jackson, Jefferson, Johnson, Leavenworth, Lyon, Marshall, Nemaha, Osage, Pottawatomie, Riley, Shawnee, Wabaunsee, Wyandotte

Northeast Kansas Projects

District 2 North Central Kansas

Counties: Chase, Clay, Cloud, Dickinson, Ellsworth, Geary, Jewell, Lincoln, Marion, McPherson, Mitchell, Morris, Ottawa, Republic, Saline, Washington

North Central Kansas Projects

District 3 Northwest Kansas

Counties: Cheyenne, Decatur, Ellis, Gove, Graham, Logan, Norton, Osborne, Phillips, Rawlins, Rooks, Russell, Sheridan, Sherman, Smith, Thomas, Trego, Wallace

Northwest Kansas Projects

District 4 Southeast Kansas

Counties: Allen, Anderson, Bourbon, Chautauqua, Cherokee, Coffey, Crawford, Elk, Franklin, Greenwood, Labette, Linn, Miami, Montgomery, Neosho, Wilson, Woodson

Southeast Kansas Projects

District 5 South Central Kansas

Counties: Barber, Barton, Butler, Comanche, Cowley, Edwards, Harper, Harvey, Kingman, Kiowa, Pawnee, Pratt, Reno, Rice, Rush, Sedgwick, Stafford, Sumner

South Central Kansas Projects

District 6 Southwest Kansas

Counties: Clark, Finney, Ford, Grant, Greeley, Gray, Hamilton, Haskell, Hodgeman, Kearny, Lane, Meade, Morton, Ness, Scott, Seward, Stanton, Stevens, Wichita

Southwest Kansas Projects

Featured Projects

IKE Projects

The dashboard below provides a status update on projects in the pipeline – T-WORKS, announced IKE projects, and additional IKE projects, whether in design or in construction. The project data can be filtered by KDOT district, project type, and pipeline, and depending on the project’s status, the table will provide information on the location, schedule, and estimated costs.

View the Project Dashboard

IKE Project Selection Criteria

KDOT uses a series of methods that vary between project types.

Preservation projects are selected using well-defined, objective data through KDOT’s priority formula which is based on several engineering factors such as geometrics and safety, capacity, pavement structure, and pavement surface data. This data allows KDOT engineers to develop, prioritize and select for construction the preservation projects needed to maintain the state’s transportation system.

Modernization and Expansion projects are identified through the Local Consult process and scored. That information is used by KDOT to select projects for the development pipeline. Scores for each of these project types are developed based on the weighing factors in this chart:

Project Scoring Factors for Modernization and Expansion Projects

Program Engineering Factors Regional Priorities Economic Impact
Modernization 80% 20%
Expansion 50% 25% 25%

 

For Modernization projects, similar to Preservation projects, KDOT looks at geometrics and safety, capacity, pavement structure, and pavement surface data for 80% of the project score. The remaining 20% is determined following the Local Consult process to reflect regional priorities.

For Expansion projects, KDOT looks at current and future congestion levels, safety, and truck traffic to determine the engineering score. The engineering score weights these factors differently for urban and rural projects, as shown in the table below. These differences are in response to local input from Kansans, who asked us to put more emphasis on congestion in the state’s urban areas and on safety and truck traffic in the state’s rural areas.

Engineering Scoring Factors for Expansion Projects

Project Area Current Congestion Future Congestion Truck Traffic Safety
Rural 30% 20% 25% 25%
Urban 40% 30% 15% 15%

 

Scores for expansion projects also include 25% that is determined following the Local Consult process to reflect regional priorities and 25% economic impact. To develop an economic impact score, expansion projects that have high engineering scores and local support also undergo an economic analysis. That analysis looks at:

  1. Gross Regional Product (GRP) - The value of goods and services produced in a region. The impact to GRP is calculated by the travel time savings of freight delivery, decrease in commute times and increase in travel time reliability that would occur due to a project.
  2. Traveler Benefit - This is the amount of time people save outside of their work commutes (such as time spent shopping, visiting family, doctor visits etc).
  3. Benefit Cost - GRP + Traveler Benefit divided by the cost of the project. When analyzing projects for economic benefits, rural projects and urban projects are separated due to the differences in their respective economies. 

Local Consult Process 

Local input is gathered on an ongoing basis and during KDOT’s Local Consult process, which takes place every two years.

Expansion and Modernization Project Pipeline

About every two years, KDOT will announce modernization and expansion projects. These projects will enter the development pipeline or construction pipeline based on a variety of factors, including feedback from Local Consult. In the development pipeline, projects are studied and designed. Some of these projects will move on to the construction pipeline based on readiness, relative need, and budget. This process gives us flexibility to adapt to changing needs and revenues every two years instead of every 10 years as in previous programs. That is a strong benefit of a rolling program.

IKE Project Pipeline Process Graphic