Project Description

This priority bridge replacement project is in the early design phase and includes replacement of the U.S. 24 Bridges over Goodyear Road in north Topeka in Shawnee County. Specifically, this project is the replacement of bridge #076 (westbound) and bridge #077 (eastbound), which are located 1.67 miles east of the U.S. 24 / U.S. 75 junction. 

Replacement of the existing bridges is necessary due to the end of their service life. Additional benefits of the project include reducing future maintenance needs and enhancing safety and connectivity. 

This project is part of the KDOT Priority Bridge Replacement Program, and it is anticipated to be under construction in the fall of 2025. 

Project Location

US 24 over Goodyear Road. Project Map

Project Details

Project Name U.S. 24 Bridges over Goodyear Road
Project Number KA-6481-01
Location U.S. 24 Bridges over Goodyear Road in north Topeka in Shawnee County, and specifically, bridge #076 (westbound) and bridge #077 (eastbound), which are located 1.67 miles east of the U.S. 24 / U.S. 75 junction. 
Scope Bridges replacement project to replace two bridges along U.S. 24 over Goodyear Road. Current Preliminary Design Phase involves roadway design, bridge design, traffic analysis, traffic modeling, a Transportation Management Plan, maintenance of traffic staging and phases, and community engagement. Future construction phase will include the removal of the two U.S. 24 Bridges over Goodyear Road and construction of replacement bridges. 
Approximate Length N/A
Project Timeline Preliminary Design
Construction Cost 5.2 million 

Related Projects

Public Meetings

Events

More Events

Project Materials

Documents

Project Contacts

StaffTitlePhoneEmail
Baalman, SteveTopeka Metro Engineer(785) 296-2291
Craft, KateDistrict 1 Public Information Officer(785) 817-9366