Kansas Department Of Transportation
Home MenuSouth Moonlight Road Bridge Replacement over I-35
Project Description
This priority bridge replacement project is in the preliminary design phase and includes replacement of the South Moonlight Road Bridge over I-35 and realignment of 183rd Street at I-35 in Johnson County. Construction is expected to begin in 2027.
Replacement of the existing bridge is necessary due to the end of its useful design life. Additional benefits of the project are reducing future maintenance needs, enhancing safety and allowing connectivity from South Moonlight Road to a nearby paved shared-use path to carry bicyclists and pedestrians over the bridge.
Project Location
Project Details
Project Name | South Moonlight Road Bridge Replacement over I-35 |
Project Number | KA-6479-01 |
Location | I-35: Bridge #011 (over I-35, westbound and eastbound) at Moonlight Road located 7.13 miles northeast of the Miami/Johnson county line |
Scope | Bridge replacement project along South Moonlight Road over I-35 and the realignment of 183rd Street in Johnson County, and project will connect to a nearby shared use paved path to carry cyclists and pedestrians across the bridge. |
Approximate Length | n/a |
Project Timeline |
2024 Finalize design plans 2025 Right-of-way coordination and utility relocation 2027 Construction expected to begin. Work is planned to last one construction season, pending weather conditions. |
Construction Cost | $10.5 million |
Public Meetings
Events
-
South Moonlight Road Bridge Replacement over I-35
12/05/2023 5:00 PM - 6:30 PM